Breckenridge Tennis

Breckenridge Tennis

Location: Breckenridge, CO

General Contractor: Hyder Construction

Supply & Erection: Lefever Building Systems

Project Duration: Approximately 5 months

Contract Budget: @ $700K

Project Overview & Scope:

  • Full design of building structure; Supply & Erect Varco Pruden PEMB.
  • Scope included insulated metal panels on walls and standing seam roof.
  • Project scope included all man doors, louvers, snow bars, etc.
  • Design required structural loading calculations to support high snow loads, suspended nets and other equipment hanging from building structure.

Key Features:

  • Facility houses two (2) indoor Tennis courts, pro shop, locker rooms & viewing area.
  • Construction work performed throughout the winter at 9,500’ on a very small and limited job site.
  • Building design entailed multiple roof heights, multiple panel colors, overhangs, soffits and canopies.