Breckenridge Water Treatment

Breckenridge Water Treatment

Location: Breckenridge, CO

General Contractor: Moltz Construction

Pre-Engineered Metal Building: Varco Pruden Buildings

Supply & Erect: Lefever Building Systems

Project Duration: 9 Months

Project Overview and Scope:

  • Led full design of building structure
  • Construction work performed throughout winter at 9500’ elevation, which created extremely difficult working conditions
  • Individual buildings constructed in precise sequence to maintain critical project schedule   requirements

Key Features:

  • Project scope included 5 buildings. The largest of these buildings is 14,000 SF
  • Buildings are architecturally complex with clerestories, overhangs, soffits, canopies, and alternating colors in wall panels