Ball Aerospace Phase I

Ball Aerospace Phase I

General Contractor: GH Phipps Architect: H+L Architecture Ltd. AIA; Robert Rody Supply & Erection: Lefever Building Systems Project Duration: 4 months, December 2008 – March 2009 Project Overview:  Building was anchored down to the top level of a two story...
Wings Over the Rockies

Wings Over the Rockies

Project Location: Centennial, CO Architect: D2C PEMB supplied by: VP Buildings Project Time Frame: October 2017 – July 2018 Project Overview & Scope: Hangar for Aviation Museum located at Centennial Airport.  Building footprint of roughly 18,000 SF with a...
SunBorne Hangar

SunBorne Hangar

General Contractor: Shaw Construction Architect: H&L Architecture Concrete Work: Shaw Construction Supply & Erection: Lefever Building Systems Project Duration:   5 months Project Overview: Design/Build project for FBO Office, Hangar & Carport....
DLTB Hangar

DLTB Hangar

General Contractor: Saunders Construction Pre-Engineered Metal Building: Varco Pruden Buildings & Kingspan Insulated Panels Supply & Erection: Lefever Building Systems Project Duration: 8 Months Total Cost: Approximately $3 million Project Overview: Lefever...
Ubergrippen Climbing

Ubergrippen Climbing

Location: Denver, CO 80238 Architect: OLC Architecture Building supplied by: Varco Pruden Buildings Project Time Frame: September 2008 – April 2009