CWX Service Center – Trucking Terminal and Maintenance Facility

Fort Collins, CO

Pre Engineered Metal Building: Varco Pruden Buildings & Lefever Building Systems
Project Duration: February - June 1999
Total Project Cost: Approximately $950,000
Facilities: Includes an Administration building, Freight Terminal; Fueling building and Maintenance building
Project Scope: Lefever Building Systems designed and supplied metal building and self-performed erection

Building Features & Project Notes

  • Roughly 57,000 square feet total in the facility
  • 121 dock doors installed in Freight Terminal Building
  • Wash Bay & Maintenance Area
  • Roof supports two 8000-pound roof top units.
  • Insulation is a two layer system using a semi-rigid foil backed panel as protection from the moisture generated by the wash bays.
  • One change order on project – $6,700
  • Project delivered to owner on time