Denver Country Jail

Greeley, CO

Project Location: Denver, CO
Architect: Reilly Johnson Architecture
Pre-Engineered Metal Building: VP Buildings
Supply & Erection: Lefever Building Systems
Project Time Frame: July 2008 - December 2008

Project Overview and Scope: Supply & Erection of large PEMB (140′ x 200′ x 16′; second section 110′ x 62′ x 32′) provides an industrial kitchen facility. Taller area. Roof pitch of 1:12. Structure includes a 34′ x 20′ deep recessed loading dock as well as 21 roof curbs and a roof top hatch.

Key Features:

  • Security requirements (prison facility) made this a difficult project to construct.
  • LBS provided high level of employee screening and security to meet project requirements.
  • Project shows LBS ability to work and be efficient in challenging and less productive environments.
  • Lefever delivered the project on time, within budget and to the satisfaction of the customer.