Ft. Riley (Company Operations and TEMF)

General Contractor: Alutiiq
Pre-Engineered Metal Building: Varco Pruden
Supply and Erection: Lefever Building Systems
Project Time Frame: Eight months
Total Cost: $2.4M

Project Scope: Four buildings including a Company Operations Facility (COF), a large maintenance facility (TEMF) as well as two related support structures.

Key Project Features:

  • Project Size: Approximately 80,000 s.f.
  • The TEMF facility includes a 20 Ton bridge crane.