Greeley Corporate Jet Center, Greeley Airport

General Contractor: Lefever Building Systems
Pre-Engineered Metal Building: Varco Pruden Buildings
Supply and Erection: Lefever Building Systems
Project Time Frame: September 2002 - January 2004

Project Scope: Design-Build and General Contractor for project. LBS self performed the building design, concrete work and building supply.

Facilities: Project included a 160’x130′ (20,800 square feet) corporate hangar. Facility included full office facilities and reception area.

Key Project Features:

  • Project Size: 20,800 square foot VP Pre Engineered Steel Building
  • 26′ Eave Height
  • Bi Fold Hangar door – 85′ x 21.
  • Full office facilities including kitchen and reception area