Henderson Mine Warehouse

Milliken, CO

General Contractor: Harrison Western Construction
Pre-Engineered Metal Building: Varco Pruden Buildings and Lefever Building Systems
Project Time Frame: November 2010 - January 2011
Total Project Cost: Approximately $550,000

Project Overview: This was a Supply and Erect Project located at the Climax Molybdenum Company mine site in Empire, Colorado.

Key Project Features: The project is a 100’x15’x24′ warehouse with Simple Saver insulation. The building is loaded for 120 psf snow and 110 mph winds and is located nearly 11,000 feet above sea level. The building was designed with 100′ clear span frames and translucent wall panels along the south eave to allow for passive solar light.