Hydro Office and Shop

Fort Collins, Colorado

General Contractor Elder Construction
Pre-Engineered Metal Building Varco Pruden Buildings & Metl-Span IMPs
Supply & Erection Lefever Building Systems
Project Duration 12 weeks

Project Overview & Scope:

  • Design/Build project in which LBS worked closely with the Owner and Architect to create the desired functionality and aesthetics the owner required.
  • Construction included an Office area, full mezzanine and a separate Shop area.

Key Features:

  • Winner of Varco Pruden Hall of Fame Award!
  • Metl-Span Insulated Wall Panels using two colors to separate the Shop from the Office
  • LBS designed and fabricated custom flashing to seal the connection between the masonry and Panels to create a weather-tight air barrier.