Island Grove Event Center

Spokane, WA

General Contractor: Lefever Building Systems
Pre-Engineered Metal Building: Varco Pruden Buildings
Supply & Erection: Lefever Building Systems
Project Time Frame: November 2004 - December 2005
Project Turnkey Cost: Approximately $6.3 million

Key Building Features:

  • Steel Building Erection done by Lefever Building Systems in House Crews.
  • 20,000 Man Hours to Frame, Insulate, Sheet and Trim out.
  • Chief Industries Pre-Engineered Steel Building.
  • Full tenant finish including offices, industrial kitchens, Ticketing, Restrooms (200 x 300 x 24′; 80,000 square feet).
  • 3- 40×50 Cupolas on top of the Arena Roof with an overall height of 46′.
  • Over 41 miles of Electrical wiring.
  • Custom pre cast panels revealing the Pawnee Buttes.
  • Sound Systems with 30 JBL speakers, 44 Lowell speakers and 12 JBL amplifiers.
  • Over 5,000 cubic yards, ( LBS concrete finished 20,000 Sq. ft. flat work per day
  • Exterior site improvements and parking lot.
  • Project on time and under budget.