Lone Tree Maintenance and Storage Center

General Contractor: MW Golden Constructors
Pre Engineered Metal Building: Varco Pruden Buildings & Lefever Building Systems
Project Time Frame: June - October 2003
Total Project Cost: Approximately $400,000
Project Scope: Lefever Building Systems were the supply and erect subcontractor for a maintenance a storage facility.

Key Building Features:

  • The project has an offset ridge line with the front sidewall eave height at 22′ and the back sidewall at 18′-8″
  • The roof slope is 10:12
  • The front sidewall and left endwall incorporate the use of colored split faced masonry
  • The roof and walls were insulated with a 4″ (R-13) reinforced faced insulation