Maple Grove

Lakewood, CO

General Contractor: Hydro Construction
Architect: Malcolm Pirini
Pre-Engineered Metal Building: Varco Pruden Buildings and Lefever Building Systems
Project Time Frame: Two Years for Phases 1 through 4 (2008-2010)
Total Cost: Approximately $600,000

Project Scope: Supplied and erected pre-treatment, maintenance, chemical storage, and office building for consolidated water company.

Key Project Features: An upgraded T-10 Wall Panel was used along with unique window shapes to provide an architectural look. The interior space of the buildings was fully lined to protect the insulation from the moist environment created by the Water Treatment Processes.