Moffat County Storage Building

Denver, CO

General Contractor: Lefever Building Systems
Pre Engineered Metal Building: Varco Pruden Buildings & Lefever Building Systems
Project Time Frame: August - December 2008
Total Project Cost: Approximately $ 670,000
Project Overview: 20,000 sq ft - Replacement Building
Scope: Construction manager/General Contractor

Facilities: Building had burned down and we replaced part of the structure and the sheeting. Reconstruction project included a new office structure inside with bathrooms, office and break room.

Details on Steel Buildings:
Roof Panels: 26 gauge R panel walls
Wall Panels: 26 gauge R panel roof

Key Building Features: Building had caught fire and had extensive damage. We were awarded the job first as the construction manager and then as the General Contractor. We demolished the building and replaced all sheeting and 30% of the steel structure. The project also included a small office with all new electrical, mechanical and plumbing for the entire building and office area.