Northern Hills Christian Church

Northern Hills Christian Church

Location: Brighton, CO

Architect: Anderson Mason Dale Architects

Pre-Engineered Metal Building: Varco Pruden Buildings

Supply & Erect: Lefever Building Systems

Project Time Frame: Five Months – Feb. 2006 – May 2006

Project Overview and Scope:

  • Structure was an addition to the existing facility
  • Project was competed on-time and under budget
  • Coordinated with the architect to produce a striking design
  • Project schedule required coordination with other subcontractors and with ongoing church activities

Key Features:

  • Architecturally striking design required coordinated work with Architect and owner to achieve end result.
  • Reverse taper exterior columns allows maximum use of interior space while providing distinctive architectural detail. Galvanized structural steel was used to achieve the look.
  • Project schedule required coordinating erection with other subs and the ongoing activities of the existing buildings.
  • Project completed on time and on budget