Sears Retail Center

Fort Carson, CO

Design/Build Contractor: Lefever Building Systems
Pre Engineered Metal Building: Varco Pruden Buildings
Erection: Lefever Building Systems
Concrete Work: Lefever Building Systems
Project Time Frame: January - May 2004
Project Cost: Approximately $650,000

Project Scope: General Contractor on a Design/Build project for a Retail/Office project, including demolition of pre-existing structure. Self performed concrete work and supply and erection of Varco Pruden Pre-Engineered metal building

Schedule: Project was completed in less than four months including demolition of previous structures, construction of new building and site work including asphalt paving.

Facilities: 12,000 square feet of usable space; building foot print 80′ x 120′; includes warehouse & shop space as well as large retail showroom. LBS provided project design and value engineering to maximize building effectiveness and meet budget goals.

Key Building Features:

  • Project Size: 80′ X 120′ x 14′; 12,000 Square Feet, VP Xpress Steel Pre Engineered Steel Building.
  • Building exterior finished with Insulated Panel Systems for architectural accent.
  • Concrete loading dock with two overhead doors.
  • Interior includes office area, bathroom as well as open design for future expansion.
  • Managed all trades including plumbing, electrical, site work & paving.
  • Project on time and under budget.