Vestas

Golden, CO

General Contractor: PCL
Pre-Engineered Metal Building: Varco Pruden; Insulated Panel Systems by Kingspan
Supply and Erection: Lefever Building Systems
Project Time Frame: January - August 2009
Total Cost: In excess of $8 million

Project Scope: LBS Supplied and erected the Pre Engineered Metal buildings and insulated panel systems for the walls and roof of these two structures. Total square footage of the PEMB project was approximately 186,000 SF. In addition LBS provided and installed approximately 113,000 SF of insulated wall panels on the 431,000 SF Production Facility Building. Job included all exterior man doors (overhead and man doors) as well as roughly 250 skylights. Project included the supply and installation of a 30 ton bridge crane. In addition LBS supplied and installed 12 26′ x 26′ custom interior doors specifically designed to enhance the internal production flow. Surface Treatment Building Internals Building.

Key Project Features: This is a large production facility for windmill tower production. On the site steel fabrication is performed to convert plate steel into finished support towers for windmill powered generators. Project was completed on a very demanding time schedule to meet production needs. The facility is a very large scale industrial production housing a variety of unique production equipment.