Ball Aerospace Phase II

Ball Aerospace Phase II

General Contractor: G.H. Phipps Architect: H +L Architecture Ltd. AIA; Robert Rody Supply & Erection: Lefever Building Systems Project Duration: 4 Months, December 2011 – March 2012 Project Overview:  Building is a rooftop structure that was constructed on...
Ball Aerospace Phase I

Ball Aerospace Phase I

General Contractor: GH Phipps Architect: H+L Architecture Ltd. AIA; Robert Rody Supply & Erection: Lefever Building Systems Project Duration: 4 months, December 2008 – March 2009 Project Overview:  Building was anchored down to the top level of a two story...
Ubergrippen Climbing

Ubergrippen Climbing

Location: Denver, CO 80238 Architect: OLC Architecture Building supplied by: Varco Pruden Buildings Project Time Frame: September 2008 – April 2009
Denver Tennis Park

Denver Tennis Park

Location: Denver, Colorado Pre-Engineered Metal Building: Varco Pruden Buildings Supply & Erection: Lefever Building Systems Project Time Frame: Approximately 5 months Contract Budget: $ 1.4 Million Project Overview & Scope: Full design of building structure;...
Earth Treks

Earth Treks

Location: Englewood, Colorado Pre-Engineered Metal Builder: Varco Pruden Buildings Supply & Erection: Lefever Building Systems Project Time Frame: 8 Months (thru Winter) Project Cost: $ 750,000 Project Scope: New Building Construction Key Project Features:...