Location: Denver, Colorado
Pre-Engineered Metal Building: Varco Pruden Buildings
Supply & Erection: Lefever Building Systems
Project Time Frame: Approximately 5 months
Contract Budget: $ 1.4 Million

Project Overview & Scope:
- Full design of building structure; Supply & Erect Varco Pruden PEMB.
- Project Scope included all Skylights, O/H doors, windows, etc.
- Design required structural loading calculations to support suspended nets and other equipment hanging from building structure.