Lofts at Timberline

Lofts at Timberline

Location: Fort Collins, CO

General Contractor: Elder Construction, Inc.

Pre-Engineered Metal Buildings: Varco Pruden Buildings

Supply & Erect: Lefever Building Systems

Project Duration: 6 Months

Project Overview and Scope:

  • Overcame heavy snow storms that damaged in-place construction
  • Completed construction on-schedule in spite of the MetalSpan wall panels arriving 2 months late
  • Maintained schedule and met customer requirements and expectations in spite of unforeseen problems

Key Features:

  • Structure measures 27,300 SF
  • 3000 SF mezzanine
  • Design utilizes three different styles of MetalSpan wall panels, which distinguish between the different areas of the building
  • Skyscape awnings are functional and architecturally-pleasing

Similar Projects