Location: Breckenridge, CO
General Contractor: Moltz Construction
Pre-Engineered Metal Building: Varco Pruden Buildings
Supply & Erect: Lefever Building Systems
Project Duration: 9 Months
Project Overview and Scope:
- Led full design of building structure
- Construction work performed throughout winter at 9500’ elevation, which created extremely difficult working conditions
- Individual buildings constructed in precise sequence to maintain critical project schedule requirements
Key Features:
- Project scope included 5 buildings. The largest of these buildings is 14,000 SF
- Buildings are architecturally complex with clerestories, overhangs, soffits, canopies, and alternating colors in wall panels