Lofts at Timberline

Lofts at Timberline

Location: Fort Collins, CO General Contractor: Elder Construction, Inc. Pre-Engineered Metal Buildings: Varco Pruden Buildings Supply & Erect: Lefever Building Systems Project Duration: 6 Months Project Overview and Scope: Overcame heavy snow storms that damaged...
Waste Management

Waste Management

Location: Commerce City, CO General Contractor: ET Environmental Pre-Engineered Metal Building: Varco Pruden Buildings and Lefever Building Systems Supply & Erect: Lefever Building Systems Project Duration: 8 Months Project Overview and Scope: Project scope...
Ball Aerospace Phase II

Ball Aerospace Phase II

Location: Broomfield, CO General Contractor: G.H. Phipps Architect: H +L Architecture Ltd. AIA; Robert Rody Pre-Engineered Metal Building: Varco Pruden Buildings Supply & Erection: Lefever Building Systems Project Duration: 4 Months – December 2011 – March...
Ball Aerospace Phase I

Ball Aerospace Phase I

Location: Broomfield, CO General Contractor: GH Phipps Architect: H+L Architecture Ltd. AIA; Robert Rody Pre-Engineered Metal Building: Varco Pruden Buildings Supply & Erect: Lefever Building Systems Project Duration: 4 months – December 2008 – March 2009...
Ubergrippen Climbing

Ubergrippen Climbing

Location: Denver, CO Architect: OLC Architecture Pre-Engineered Metal Building: Varco Pruden Buildings Project Duration: 8 Months – September 2008 – April 2009