by Kennedy | Nov 8, 2019
Location: Commerce City, CO General Contractor: Himmelman Construction Pre-Engineered Metal Building: Varco Pruden Buildings Supply & Erect: Lefever Building Systems Project Duration: Six months – 2019 (January to June) Project Overview & Scope: ...
by Kennedy | Nov 7, 2019
Location: Brighton, CO Architect: Anderson Mason Dale Architects Pre-Engineered Metal Building: Varco Pruden Buildings Supply & Erect: Lefever Building Systems Project Time Frame: Five Months – Feb. 2006 – May 2006 Project Overview and Scope: Structure...
by Kennedy | Nov 7, 2019
Location: Pueblo, Colorado General Contractor: PCL Pre-Engineered Metal Building: Varco Pruden Buildings Supply & Erection: Lefever Building Systems Project Duration: 9 Months Project Overview and Scope: Project Scope included construction of...
by Kennedy | Nov 7, 2019
Location: Louisville, CO Architect: DAJ Design Pre-Engineered Metal Building: Varco Pruden Buildings Project Time Frame: 8 Months – July 2016 – February 2017 Project Overview & Scope: Design of building involved complex loading requirements to ensure...
by Kennedy | Nov 7, 2019
Location: Broomfield, CO General Contractor: G.H. Phipps Architect: H +L Architecture Ltd. AIA; Robert Rody Pre-Engineered Metal Building: Varco Pruden Buildings Supply & Erection: Lefever Building Systems Project Duration: 4 Months – December 2011 – March...