Landing Place Church

Landing Place Church

Location: Commerce City, CO

General Contractor: Himmelman Construction

Pre-Engineered Metal Building: Varco Pruden Buildings  

Supply & Erect: Lefever Building Systems

Project Duration: Six months – 2019 (January to June)

Project Overview & Scope: 

  • Designed and built new, 27,000 SF church
  • Structure design required extensive structural loading calculations so that the final structure could support suspended nets and other equipment that was to hang from the ceiling
  • Worked Closely with general contractor and owner to maintain the highest safety levels possible and work within the owner’s tight schedule and budget

Key Features:

  • Maximum occupancy of 1400 people
  • Church includes a sanctuary, child care facilities, offices, meeting rooms, and a fellowship area
  • Entire building is accented with high, vaulted ceilings