Location: Brighton, CO
Architect: Anderson Mason Dale Architects
Pre-Engineered Metal Building: Varco Pruden Buildings
Supply & Erect: Lefever Building Systems
Project Time Frame: Five Months – Feb. 2006 – May 2006
Project Overview and Scope:
- Structure was an addition to the existing facility
- Project was competed on-time and under budget
- Coordinated with the architect to produce a striking design
- Project schedule required coordination with other subcontractors and with ongoing church activities
Key Features:
- Architecturally striking design required coordinated work with Architect and owner to achieve end result.
- Reverse taper exterior columns allows maximum use of interior space while providing distinctive architectural detail. Galvanized structural steel was used to achieve the look.
- Project schedule required coordinating erection with other subs and the ongoing activities of the existing buildings.
- Project completed on time and on budget